Projects Under Way
Indoor Arena
75x150 with attached barn of 45 x75
Foundatin poured ready for building.
Funds Still needed $165,000.00
Office Space needed
Convert garage to office.
Funds Still needed $10,000
Visitors Center
Near completion! Thanks to the River of Life volunteer efforts.
Pipe Corral Project
1. Put in place permanent pipe fencing on pasture #1. Fencing is partially completed.
Funds still needed $5184.00 or donation of 1,100 ft of 2 inch pipe.
2. Pasture #2 needs 1,740 ft of 2 inch pipe to complete or $4140.00 in donations.
3. Pasture #3&4 need 1440 ft of 2 inch pipe to complete or $5712.00 in donations.
Water storage Project
Installation of two 5,000 water tanks. By using the tanks Freedom in Motion will save $600
On each 10, 00 gallons of water pumped, basically cutting the electric bill from $600 a month to
$300 a month during the summer months.
Funds needed: $3998.00
Solar System Project
Installation of a solar system will allow FIM to grow grass pastures and cut hay bill from $15,000 a year to $2000 a year. It will also zero out our water well bill of $4,200 annually. This gives FIM an annual savings of $17,200 a year.
Funds needed $48,000.00
Electric Lift:
Installation an electric lift to safely lift and place paraplegic riders onto the horses.
Funds needed: $7000.00
|
|